CONTRACT TO BUILD A 60M INNOVATIVE LONGLINER

05/05/2014
   CAP BOURBON ship-owner (LE GARREC Group) has just confirmed PIRIOU the order for a 60 m freezer longliner designed for austral fishing in the South Indian Ocean.   The vessel, to be delivered at the end of 2015 by PIRIOU’s Vietnamese shipyard, will be built according to a design by...

» leer más



PIRIOU DELIVERS 22M-TRAWLER 'MABON III'

24/04/2014
  After the delivery of ‘ CAYOLA ‘ in March 2013, PIRIOU has just delivered a second 22 m trawler to ACAV, Armement Coopératif Artisanal Vendéen, in association with Mr Romain Picaud for this vessel.    Artisanal fishing boat of the future, ‘MABON III’, a ‘CAYOLA’...

» leer más



DELIVERY OF TWO WIND FARM SUPPORT VESSELS FOR MPI

20/02/2014
Delivery of two 19 m offshore  wind farm support vessels   for MPI Workboats Ltd    PIRIOU has delivered two 19m offshore wind farm support ships for MPI, VROON's offshore wind farm subsidiary.     Started in April 2013 in our Vietnamese shipyard,...

» leer más



PIRIOU AND DCNS TOGETHER WIN THE B2M CONTRACT

09/01/2014
PIRIOU and DCNS together win the B2M contract for the supply and maintenance of three ships based overseas    PIRIOU and DCNS have together won the contract for the supply of three multi-mission ocean-going vessels, with an option for a fourth, and the associated maintenance services.   This contract,...

» leer más



PIRIOU SIGNS A NEW 5 YEAR IN-SERVICE SUPPORT CONTRACT

08/01/2014
PIRIOU NAVAL SERVICES (PNS), PIRIOU's repair branch in Concarneau, has just signed a 5 year contract with SSF, a department of the French Navy, to ensure the technical availability of its fleet.    This agreement, known as "BN13" (Navy Base 2013), which has been in place since the start of 2014, consists...

» leer más



páginas 12345678910111213141516171819202122232425262728293031323334353637