Our News

Share this :

NEW ORDER : TWO WFSV 26W FOR WIND ENERGY MARINE

07/06/2017

PIRIOU has just secured the order for two wind farm support vessels for the British operator WIND ENERGY MARINE. Built by PIRIOU VIETNAM, these two WFSV* 26W are expected to be delivered in spring 2018 in Europe and to be operated in the North Sea.

With a proven design by © BMT Nigel Gee, BV classed, MCA CAT 1 certified under the new HS-OSC code, the vessels offer excellent manoeuvrability, good performance (27,5 kn at top speed) and low fuel consumption.

They provide safe and fast transfer within a range of 150 nautical miles from a safe haven.

 

PIRIOU will attend SEAWORK in Southampton from 13th to 15th June to show its vessels and services ranges dedicated to offshore windfarm support.

(Stand PG 37)

Back to the newsBack to the news