NEW ORDER : TWO WFSV 26W FOR WIND ENERGY MARINE
07/06/2017
PIRIOU has just secured the order for two wind farm support vessels for the British operator WIND ENERGY MARINE. Built by PIRIOU VIETNAM, these two WFSV* 26W are expected to be delivered in spring 2018 in Europe and to be operated in the North Sea.
With a proven design by © BMT Nigel Gee, BV classed, MCA CAT 1 certified under the new HS-OSC code, the vessels offer excellent manoeuvrability, good performance (27,5 kn at top speed) and low fuel consumption.
They provide safe and fast transfer within a range of 150 nautical miles from a safe haven.
PIRIOU will attend SEAWORK in Southampton from 13th to 15th June to show its vessels and services ranges dedicated to offshore windfarm support.
(Stand PG 37)